Air cushion conveyor
Customer :
Xstrata Cuivre - Horne Smelter (Rouyn-Noranda)
Project :
Engineering and project management for the replacement of an existing conveyor with an air cushion conveyor. Air cushion conveyor conception by Certel Composite inc.
Equipment security
Customer :
Selbaie Mine (Joutel) and Norbord (Val-d'Or)
Project :
Design, drawings and supervision for the installation of fall protection guards protecting mobile equipment.
Bucket skip conveyor
Customer :
Fiducie Boralex (Senneterre)
Project :
Design, drawings and supervision for the installation of a bucket skip conveyor.
Dust reduction
Customer :
Xstrata Cuivre - Horne Smelter (Rouyn-Noranda)
Project :
Design, drawings and supervision for the construction of a foam box prototype to reduce dust.
Security
Customer :
Bell Allard Mine (Matagami) and Norbord (Val-d'Or)
Project :
Design, drawings and supervision for the installation of a protection system for work performed under mobile equipment.
Structure for lime silos
Customer :
Dolomex (Portage du fort)
Project :
Design, drawings, and supervision for the installation of a structure for two (2) 150 tons lime silos.
System to lower equipment underground
Customer :
Bell-Allard Mine (Matagami)
Project :
Design, drawings and supervision for the construction of a system designed to lower equipment attached below a transport cage.
Equipment security
Customer :
Xstrata Cuivre - Horne Smelter (Rouyn-Noranda)
Project :
Design, drawings and supervision for the installation of belt conveyors protection guards.
Equipment security
Customer :
Temlam (Amos)
Project :
Analysis of all entry points (injury risks) in the mill and design, drawings and supervision for the installation of protection guards on specific pieces of equipment.
Concentrator
Customer :
Xstrata Zinc - Matagami Mine (Matagami)
Project :
Design, drawings and supervision for the installation of a retractable aluminium platform used for the maintenance of hard to reach nozzles.
Vibrating feeder stands
Customer :
Century Mining - Sigma Mine (Val-d?Or)
Project :
Design, drawings and supervision for the installation of vibrating feeder stands.
Belt Conveyor
Customer :
Century Mining - Sigma Mine (Val-d'Or)
Project :
Design, drawings and supervision for the installation of a 24'' belt conveyor with protection guards.
Maintenance platforms
Customer :
Xstrata Cuivre - Horne Smelter (Rouyn-Noranda)
Project :
Design, drawings and installation supervision of platforms used for the product crane maintenance.
Expanding the mineral processing plant
Customer :
Ressources Métanor - Mine Bachelor (Desmaraisville)
Project :
Design, drawings and preparation specifications for the installation of a new rod mill (foundations, building, interior structures and equipment).